This tab sets what tool kits and tool wear add to every quote. A tool kit is the full set of cutters or inserts a job family uses up before you replace them. Quote spreads its cost over the parts one kit makes, and can also add a charge for every hour a machine is cutting.

Open it from the Pricing page, fifth tab, Tooling. Both charges are added into one tool line per part, before yield and markup.

The Tooling tab, with tool kit costs, kit life and tool wear
The Tooling tab, with tool kit costs, kit life and tool wear

Milling Tool Kit Cost#

Unit: per kit, 0 turns it off. Starting value: 44. Where: Pricing, Tooling.

One full milling tool kit, spread over the parts it makes. Off adds nothing to quotes. The toggle suggests 20 when you switch it on.

Change it when: set it to what you really spend on tools for a job family.

Lathe Tool Kit Cost#

Unit: per kit, 0 turns it off. Starting value: 18. Where: Pricing, Tooling.

One full lathe insert kit, used instead of the milling kit on turning and mill-turn routes. Off adds nothing to quotes.

The lathe kit is used for pure turning parts. Otherwise the milling kit is used. If the lathe kit cost is 0 or less, the milling kit is used.

Tool Kit Life (Units)#

Unit: parts. Starting value: 250. Where: Pricing, Tooling. Also shown as Parts Per Tool Kit.

How many parts one kit makes before it is replaced.

Whole kits needed = quantity / kit life, rounded up. Cost per part = kits x kit cost / quantity.

Change it when: set it to how many parts a kit really lasts. Use a smaller number for hard materials that eat tools.

Worked Example: An Order Of Ten#

With kit cost 44 and kit life 250, an order of 10 needs 1 whole kit, so it pays the full kit: 44 / 10 = 4.40 per part.

Quantity Kits Kit cost per part
10 1 4.40
250 1 0.18
251 2 0.35

Kit cost mainly punishes small orders, because a small order pays for a whole kit it barely uses.

Tool Wear Per Machine Hour#

Unit: per hour, 0 turns it off. Starting value: 0. Where: Pricing, Tooling.

Extra tool cost for every hour a machine is cutting. A long cycle wears tools more than a short one. The toggle suggests 2 when you switch it on.

wear = rate x cutting hours, where cutting hours = (total minutes - clamping minutes) / 60

Example: at a rate of 2 per hour, a part with 30 cutting minutes adds 0.50 per part.

Change it when: use wear for hard materials with long cycles, where tool cost follows machine time more than part count.

Watch out: filling both a high kit cost and a high wear rate counts your tools twice. Pick the one that matches how your tools are actually consumed, or keep both low.