How Prices Are Built
The lines that make up a Quote price, which setting controls each one, and how to find the setting behind a number that looks wrong.
On this page
This page explains how Quote turns a part into a price. Read it once before you tune anything, and come back to it when a quote looks too high or too low. Every number on a quote comes from one of the steps below, and every step is fed by a setting you control.
Quote builds the price separately for each quantity tier, so a quote for 1, 10 and 100 pieces is three separate calculations.
What Goes Into a Price#
Quote adds up these lines for each quantity, then applies your yield, markup and minimum.
- Machine cost. The machine time Quote estimates for the part, charged at the machine's hourly rate. The Surface Roughness setting affects cutting time.
- Material. The stock the part needs, at your price per kg, with an allowance for scrap that gets smaller as the quantity grows.
- Setup and programming. Charged once per order, then divided by the quantity. The mode you choose on Setup and Minimum decides how it is set.
- Tool kits and tool wear. Kit cost is spread over the parts one kit makes, plus a wear charge per machine hour.
- Surface finish, surface treatment and annotations. Added as separate per-part lines when the part has them.
- Packaging. The cheapest mix of boxes that holds the order, divided by the quantity.
- Material handoff for combo routes, a one-time fee divided by the quantity.
- Deburr and inspection. Labour for edges and for checking features, plus first-article inspection spread over the quantity.
- Handling fee per part.
- Yield allowance. A percentage added on top of everything above to cover scrap and first-off spoilage. It comes before markup.
- Markup. A percentage on top, set per quantity tier.
- One-piece setup allowance. Only if you switched it on, and only for single turned parts.
- Minimum Order Value. The order cannot fall below the minimum you set.
- Rounding. The unit price is rounded to 2 decimals. Total = unit price x quantity.
Worked Example#
A quantity of 10 with these per-part amounts:
| Line | Per part |
|---|---|
| Machine | 18.00 |
| Material | 6.00 |
| Startup | 3.00 |
| Tooling | 1.00 |
| Packaging | 0.50 |
| Deburr | 0.80 |
| Inspection | 0.70 |
| Subtotal before yield | 30.00 |
- Yield of 2% gives 30.00 x 1.02 = 30.60.
- Markup of 40% gives 30.60 x 1.40 = 42.84 per part, so 428.40 for the order.
- With a Minimum Order Value of 50, the floor is 50 / 10 = 5.00 per part. The computed price is far above it, so the floor does not apply.
Shipping And Quote Adjustment Sit Outside The Price#
Shipping is never part of the machining price. Quote adds it at the quote level, after the machining price is finished:
grand total = machining total x (1 + quote adjustment % / 100) + shipping
Shipping is not marked up, and it is not touched by Widget country pricing. The Minimum Order Value does not include it either. See Shipping Overview for how shipping is priced.
Which Setting Feeds Which Step#
| Line | What it covers | Where you configure it |
|---|---|---|
| Machine cost | Hourly rate and machine overheads | Machines Overview, Mill Settings, Lathe Settings, Combo Machines |
| Cutting time | Finish multiplier | Surface Roughness |
| Material | Price per kg, shape multiplier | Materials, Stock Catalogue |
| Setup and programming | Setup mode, fees, bands, loading time | Setup and Minimum |
| Tool kits and wear | Kit cost, kit life, wear per hour | Tooling Costs |
| Surface treatment | Treatments added as separate lines | Surface Treatments |
| Packaging | Boxes, foil thickness | Packaging |
| Material handoff | Combo route one-time fee | Combo Machines |
| Deburr and inspection | Labour rates, first article | Deburr and Inspection |
| Handling fee | Per-part packing labour | Packaging |
| Yield | Scrap and first-off spoilage allowance | Quantity Pricing |
| Markup | Markup per quantity tier | Quantity Pricing |
| One-piece setup allowance | Credit on single turned parts | Setup and Minimum |
| Minimum order | Smallest order you will quote | Setup and Minimum |
Pricing edits save automatically about half a second after you stop typing.
My Price Looks Wrong Checklist#
Work through these in order. Most surprises come from one of four causes.
Double Counted Setup#
- If Loading Time Per Setup is off, all clamping time is billed on every part. Turn it on if you clamp once and run many parts, so only loading repeats per part. See Loading Time Per Setup.
- With Loading Time Per Setup on, check the value is not higher than your real load time, because the excess lands back on every part.
- Look at the startup line on a small quote. A flat setup fee, a high base fee and the Minimum Order Value can all make small orders look expensive. Check which one is doing the work before changing the others.
Hourly Rate Versus Markup#
- Machine cost uses the hourly rate on the Machines page. Markup then sits on top of everything.
- If the cost is wrong because the time or rate is wrong, fix the rate or the machine overheads. Do not move markup to hide a time error, because it will be wrong again on the next part.
- Markup is not margin. A 40% markup is a 28.6% margin. See Quantity Pricing.
Scrap Versus Yield#
- Material scrap and yield both cover waste. Material scrap raises the material cost only. Yield raises the whole subtotal and then gets marked up.
- If a part is already priced with a high scrap rate on material, adding a large yield on top counts the same loss twice.
Tool Kit Versus Wear#
- Tool Kit Cost and Tool Wear Per Machine Hour both add tool cost. Filling both with high values counts your tools twice.
- Kit cost mainly punishes small orders: an order of 10 pays one whole kit. See Tooling Costs.
Tip: Compare the quote's line items to a job you know. The line that is furthest from your real cost points to the setting to change.
Calibration#
Quote has no calibration switches. Nothing on the Pricing or Shipping pages learns from your past jobs or adjusts itself.
You calibrate by measuring. Time a few real jobs, then set your real machine hourly rates and the per-machine overheads so Quote's machine time matches what the machine actually takes. Machine time matters most, so fix a time error at its source rather than through markup.
Material Scrap#
Quote adds an allowance for scrap to the material cost. It is larger on very small orders and shrinks as the quantity grows. It is not editable on the Pricing page.